摘 要:以三峡库区箭穿洞危岩为例,全面剖析长江库岸高陡岸坡类项目在概算编制中存在的重难点问题,
对如何合理、准确、科学地编制长江库岸高陡岸坡概算做出了一定的探索,为长江库岸其他高陡岸坡治理
工程设计概算编制提供参考。
关键 词: 高陡 岸 坡;概算 编制;漏项;临时措施费;对策分析
中图分类号: T U723.3 文献标识码: A 文章编号:10 02
-851X(2022 )S2 -0103 -03
DOI :10.14181/j.c n k i.10 0 2 - 851x . 20 22S2103
Difficulties and Countermeasures in Compiling the Design Budget of the High and
Steep Bank Slope Treatment Project of the Yangtze River Reservoir :Take Arrow
Piercing Dangerous Rock as an Examp le
QIAO Xiaoyan,Z E NG Yu
( 208 Hydrogeological Engineering Geological Team of Chongqing Municipal Bureau of Geology and Mineral Resources ,Chongqing
400700 ,China )
Abstract :
Taking the dangerous rock in the Three Gorges reservoir area as an example ,this paper
comprehensively analyzes the key and difficult problems in the budget estimate preparation of the high and
steep bank slope projects on the Yangtze River reservoir bank ,makes some exploration on how to reasonably ,
accurately and scientifically prepare the budget estimate of the high and steep bank slope of the Yangtze River
reser voir ban k ,and provides a reference for the budget estimate preparation of other high and steep bank slope
treatment projects on the Yangtze River reservoir bank.
Keywords :
high steep bank slope ;budget estimate preparation ;leakage ;temporary measure cost ;
countermeasure analysis
1 引 言
概算是设计文件的重要组成部分。地质灾害防治工
程的概算遵循经济规律的要求,根据设计方案和预算
标准及有关定额反映实现某一地质灾害防治工程所需
的 人 财 物 ,是 一 个 重 要 的 技 术 经 济 文 件 ,是 对 项 目 设 计 进行经济分析的一个重要工具,也是确定项目资金的重
要依据。因此,概算编制的全面性和准确性至关重要。
长江库岸高陡岸坡因地理环境的特殊性,上为陡崖绝
壁,下为滚滚江面,施工条件极差,需考虑的措施因素极
多,极易因漏项导致 概算资金不足而影响后期治理。本
文以三峡库区箭穿洞危岩为例,对长江库岸高陡岸坡治
理工程设计概算编制中的难点及对策进行研究与探讨,
为长江库岸类似项目的概算编制提供参考。
作者简介:乔小艳,水工环地质高级工程师、注册造价师,研究方向:
水 工 环 地 质 、工 程 经 济 。
长江库岸高陡岸坡治理工程设计概算编制难点
及对策分 析
— — 以箭穿洞危 岩为例
乔小艳,曾玉
(重 庆 市地 矿局 208水文地质工程地质队,重庆 400700)