摘 要 沁水盆地的煤层气开发已经由早期的单井位部署模式改变为近期的多井井丛式部署模式,为了进一步优化该气田的煤
层气集输系统,针对当前煤层气集输系统存在的“三高”(能耗高、投资高、设备闲置率高)问题,综合考虑系统开发和运行两个阶
段的需求,建立了相应的经济效益计算模型与优化模型,结合经济技术分析与软件数值模拟,提出了“干管互通式管网”的新设计
理念——在不同区块间建立铺设连通管线,使设备互为备用,有效地降低了设备闲置率。研究结果表明 : ①采用干管互通式管网设
计新理念,可以实现采气系统的互通、互联,增加管网的灵活性,进而有效提升站场平均负荷率和设备利用率,提高系统运行效率,
降低系统能耗,提高经济效益 ; ②该理念在沁水盆地某区块 4×10 8 m3/a 产能建设中的应用效果表明,系统投资降低了 20%,站场的
平均负荷率提升了 30%,系统运行效率提高了 10%,运行能耗降低了 20%,收益增加 2 000 余万元。结论认为,该设计思路对今后
煤层气田新区块开发建设具有重要的借鉴意义。
关键词 沁水盆地 煤层气 集输管网 优化 能耗 投资 干管互通 低耗 高效
DOI : 10.3787/j.issn.1000-0976.2019.10.012
A new design concept of pipeline network with interconnected trunk lines for
energy saving, cost reducing and efficiency increasing in CBM fields
Meng Fanhua 1,2, He Zhuo 3, Li Xiaoping 3, Wang Zihui 1 & Liu Ruijuan 1
(1. CBM Branch Company
, PetroChina Huabei Oilfield Company, Changzhi, Shanxi 046000, China; 2. CNPC CBM
Exploitation Pilot Base , Changzhi , Shanxi 046000, China; 3. National Engineering Laboratory for Pipeline Safety//
MOE Key Laboratory of Petroleum Engineering//Beijing Key Laboratory of Urban Oil and Gas Distribution Technolo -
gy//China University of Petroleum, Beijing 102249 , China )
NATUR. GAS IND. VOLUME 39, ISSUE 10, pp.95-102 , 10/25/2019. (ISSN 1000-0976; In Chinese)
Abstract: At present, coalbed methane (CBM) development in the Qinshui Basin has been transformed into multi-well cluster deploy -
ment mode from the earlier single-well deployment mode. In order to optimize the CBM gathering and transportation system in the Qin -
shui Basin further and deal with the "three highs" problem (high energy consumption, high investment and high idling rate of equipment)
existing in the current CBM gathering and transportation system, with the demands of two stages (i.e., system development and operation)
taken into consideration comprehensively, this paper established the corresponding economic benefit calculation model and optimization
model. Then, combined with the economic and technological analysis and software numerical simulation, a new design concept of "pipe -
line network with interconnected trunk lines" was put forward. That is to build and lay connecting pipelines between different blocks to
make the equipment spare to each other, so that the idling rate of equipment can be reduced effectively. And the following research results
were obtained. First, the adoption of the design concept of pipeline network with interconnected trunk lines can realize the interconnec -
tion of gas production systems and increase the flexibility of the pipeline network, so as to effectively increase the average station load
rate, equipment utilization rate and operation efficiency, reduce energy consumption, and improve economic benefit. Second, the applica -
tion effect of this concept to the productivity construction of 4×10 8 m3/a in a certain block of the Qinshui Basin shows that the investment
in the system is reduced by 20%, the average station load rate increased by 30%, the operation efficiency increased by 10%, the operation
energy consumption reduced by 20%, and the benefit increased by over CNY 20 million. In conclusion, this design concept is of an im -
portant guiding significance