1 工程概况
中兴大桥是连接江北、鄞州两个中心区的跨江通道。主
桥采用一跨过江矮塔斜拉桥,跨径布置为 700 m,主桥全宽
29 m。
2 钢塔的技术特点
主塔外形采用 V形塔柱,竖向倾角 25°,塔顶设中间横
梁平衡中边跨索力水平分力。主塔横桥向宽 3.6 m,顺桥向宽
4~5.7 m,桥面以上塔高约 37 m。
主塔在工厂分节段进行制作,分成 7个节段,钢塔节段划
分图如图 1所示。
[摘 要]
;??
8o?%????, ? c1
Sg
??n亭??m??
?, n?、??,<?、]Yk 姚$,
t凹??坤:其]刊g ,??&?]
?g 、
Jk?&m?? ,gN??ch?m}1r其], :君埋N?m 、?g
]?。 [关键词]1
S ;g
??] ;gN ;?g
[中图分类号]TU 391 b b b b b [文献标志码]B b b b b b[文章编号]1001–523X(2020)02–0098–02
Installation Precision Control Technology of Rotating Hinge for Steel
Tower Swivel Construction
Yang Xue-bin,Li Sheng-qian ,Zhou Guo-qing,Zhang Yin-guo,Zhang Xi-jie
[Abstract
]With the development of computer control technology, the turning of bridge steel tower is one of the representative
installation methods, which has the advantages of safety, reliability, economy, short construction period, etc. In order to further improve
the processing accuracy, reduce the difficulty of site construction and shorten the installation time , The rotary hinge and its upper and
lower segments are assembled and tested in a steel structure processing plant. [Keywords
]steel tower ;rotation construction ;rotation comparison ;trial rotation
钢塔转体施工转动铰安装精度
控制技术
杨学斌,李胜乾,周国庆,张银国,张西杰
(中建钢构江苏有限公司,江苏泰州 225300)
3 钢塔总体安装思路
索塔锚固区单节段重达 450 t,由于结构特殊,节段尺寸
不能划小,一般起吊设备难以满足,经过比选确定采用钢塔
竖转的施工方法。 桥位钢塔安装在桥面搭设滑移轨道及拼装胎架,用浮吊
将主塔节段吊装至桥面滑移轨道上,通过顶推滑移工艺顶推
至拼装胎架上,然后将 V形主塔两根立柱分别拼装成整体后,
采用竖转工艺(图 3)安装到位,最后提升中间塔顶横梁合龙段,
完成钢塔安装。
收稿日期 : 2019–09–10
作者简介: 杨学斌(1970—),男,江苏海门人,工程师,主要研究方向
为钢结构制造生产管理。
塔梁固结节点与主梁固结,通过塔脚段与主梁焊接(图 2),
对应的主梁内部进行加强。 钢塔结构主要有以下特点。
(1)钢塔采用全焊接结构,面板厚度 36~50 mm,焊接熔
敷量大,焊接变形控制难度大、容易产生焊接变形。 (2)塔高约 37 m,塔横桥向宽 3.6 m,塔高宽比约 10∶1。
现场施安装精度高,尤其是横桥向对接,增加施工难度。
图2 塔梁结合段结构
图3 桥位钢塔转体照片
由于制作与安装界面划分,转体转动铰(图 4)一般由钢
结构安装单位负责加工、桥位安装、试转。但是受桥位起重
设备、施工环境、施工人员等影响,转体转动铰桥位安装精
度无法保障,施工周期长,同时现场焊接造成油漆破坏。 为了保证转动铰安装精度、缩短现场安装工期,转体转
动铰及加强在加工厂里完成加工制作,并进行试转工作。 工厂转动铰加工、安装主要流程:转铰位置局部加强→上、
图1 钢塔节段划分
63.57 23.585 23.585 16.4
HL ZT4+5
ZT2+3
ZT1 ZT1
ZT2+3
ZT4+5
23.14
11.5
4
37.79 塔梁结合段
钢箱梁桥面
塔梁结合段
工程技术 $ ?
~ 6 '