建筑施工·第41卷·第2期 263
一种新型钢框活动吊耳式装配式道路的预制与施工
孟丽娟 甘益豪
中建二局第二建筑工程有限公司 江苏 南京 210000
摘要: 介绍一种新型的钢框活动吊耳式装配式道路施工技术,它可以大大提高一次使用完整率和周转率,值得在建筑
工程施工现场推广应用。在总结若干工程经验的基础上,对其关键施工方法作了较为详尽的阐述。
关键词: 装配式道路;钢框;活动吊耳;预制;施工技术
中图分类号:
TU756.4 +4 文献标志码: A 文章编号: 1004 -1001(2019)02 -0263 -03 DOI: 10.14144/j.cnki.jzsg.2019.02.029
Prefabrication and Construction for Steel Frame
Movable Lug-Type Fabricated Road
MENG Lijuan GAN Yihao
The Second Construction Engineering Company Ltd. of China Construction Second
Engineering Bureau, Nanjing, Jiangsu 210000, China
Abstract:
This paper introduces a new type of construction technology for steel frame movable lug -type fabricated
road, which can greatly improve the one -time completeness rate and turnover rate of, and is worthy of promotion and
application at the construction site. On the basis of summarizing several engineering experiences, the key construction
methods are elaborated in detail.
Keywords: fabricated road; steel frame; movable lug; prefabrication; construction technology
结构施工 STRUCTURE CONSTRUCTION
图1 预制混凝土块
题,提高了装配式道路的一次使用完整率和周转率。
该 装 配 式 道 路 采 用 工 字 钢 和 槽 钢 相 结 合 的 方 式 加 工
成钢框,方钢内撑加固,板筋直接焊接在型钢上,做成预
制道路定型模具,无需另外支设模板。吊装部位采用活动
式插销吊耳,吊装时拔出,吊装完毕后落下隐蔽在工字钢
内。预制混凝土块直接拼装成现场需要尺寸的场坪或者道
路,单块板尺寸为 2 m×3 m 。
3 主要施工方法
钢框活动吊耳式装配式道路预制作业可在专门的预制
加工厂进行预制,预制完成后运输至施工现场拼装,也可
以在现场设置预制场地,或者按照规划好的场地预制一期
临时道路,再周转至后期工程。以下流程按照预制加工厂
预制方式阐述。
3.1 预制场地准备
预制场地要求平整、坚实、不起灰。预制厂要专门浇
筑一块预制场地,首先要保证基层夯实,在面层混凝土浇
1 应用背景
建筑工程施工现场临时场坪、道路为临时工程,根据
文明施工要求需要硬化,目前通常采用现浇方式,一次性
投入,使用完毕后破除运出现场。所以现浇地坪、道路具
有投入成本高、耗能大且产生大量建筑垃圾等缺点,不利
于绿色施工要求的实现。 因此,市场上的混凝土预制道路应运而生
[1-2] 。混凝土
预制道路采用预制混凝土块方式(图 1),现场拼装,可实
现部分周转,减少了现场浇筑场坪道路的湿作业施工,并
大大缩短了临建场布工期,尤其对场地狭窄、需要动态布
置的现场做到了灵活便利。但该预制道路在使用中混凝土
边角易破坏,吊装孔由于在混凝土板面留孔,在车辆多次
碾压后极易被破坏,造成周转率不高。随后有公司对其进
行了改进,包括在混凝土块的四周边框加设角钢护角、吊
装孔内灌砂等,但效果并不明显。
2 钢框活动吊耳式装配式道路技术
本技术主要解决预制道路边角和吊装孔易被破坏的问
作者简介:孟丽娟(1975—),女,本科,高级工程师。
通信地址:江苏省南京市浦口区浦珠北路88号江苏总部
基地16栋1单元(210000)。
电子邮箱:573472224@qq.com
收稿日期:2018 -10 -25
2019·2·
一种新型钢框活动吊耳式装配式道路的预制与施工(论文).pdf