2022·12·Building Construction 3030
某地铁隧道病害治理施工工艺及环境影响评估
金 易
上海公路桥梁(集团)有限公司 上海 200433
摘要: 针对上海虹桥地区某隧道的沉降问题,对病害成因进行分析后,通过桥板结构将地面荷载传递到深部持力层以
减小隧道沉降。比较了不同沉桩工法的优劣,阐述了免共振振动沉桩工法的可行性与工艺流程。通过隧道内多个测点
的监测,结果表明:振动沉桩对隧道垂直沉降及水平位移影响不大,绝大部分测点采集的数据满足设计要求;但该工
艺对管径的影响十分明显,77%的断面管径缩小了0~20 mm,20%的断面管径缩小值超过20 mm,说明应用该工法时
必须注意周围构筑物管径收敛的容许情况。
关键词: 隧道工程;变形控制;振沉桩;影响监测
中图分类号: U 25 文献标志码: A 文章编号: 1004 -1001(2022)12 -3 030-0 4 DOI: 1 0.1 4144/j. c nki. jz sg .2 022.1 2.0 61
Construction Technology and Environmental Impact Assessment
of Disease Treatment in One Subway Tunnel
JIN Yi
Shanghai Highway and Bridge (Group) Co., Ltd., Shanghai 200433, China
Abstract: A im in g a t th e s e ttle m ent p ro b le m o f a tu nnel in H ong qia o a re a o f S hang hai, a fte r a naly zin g th e c ause o f th e d is e ase ,
th e g ro und lo ad is tr a nsfe rre d to th e d eep b earin g s tr a tu m th ro ug h th e b rid ge s la b s tr u ctu re to re d uce th e tu nnel s e ttle m ent.
T he a d va nta g es a nd d is a d va nta g es o f d if fe re nt s in kin g p ile c onstr u ctio n m eth od s a re c om pare d , a nd th e fe asib ilit y a nd
te chnolo g ic al p ro cess o f re so nance -fr e e v ib ro -s in kin g p ile c onstr u ctio n m eth od is e xp ound ed . T hro ug h th e m onit o rin g o f
s e ve ra l m easu rin g p oin ts in th e tu nnel, th e re su lt s s h ow th at th e v ib ro -s in kin g p ile h as lit tle in flu ence o n th e v e rtic al s e ttle m ent
a nd h oriz o nta l d is p la cem ent o f th e tu nnel, a nd th e d ata c olle cte d b y m ost m easu rin g p oin ts m eet th e d esig n re q uir e m ents ;
h ow eve r, th e in flu ence o f th is p ro cess o n th e p ip e d ia m ete r is v e ry o b vio us, th e d ia m ete r o f 7 7% s e ctio n p ip es is r e d uced b y
0 ~ 20m m, a nd th e d ia m ete r o f 2 0% s e ctio n p ip e is r e d uced b y m ore th an 2 0m m, w hic h in d ic ate s th at a tte ntio n m ust b e p aid to
th e a llo w ab le c ond it io n o f p ip e d ia m ete r c onve rg ence o f s u rro und in g s tr u ctu re s w hen a p ply in g th is m eth od .
Keywords: tu nnelin g w ork s; d efo rm atio n c ontr o l; v ib ro -sin kin g p ile ; im pact m onit o rin g
沉 降问题,制定并实施了修筑桥板结构传递上部荷载以控
制隧道变形的治理方案,并对施工过程中隧道所受影响进
行了监测。本文将就本治理项目的方案及监测结果进行介
绍,为上海地区隧道沉降治理提供可行性参考。
1 工程概况及病害分析
上海虹桥机场是上海建设国际航运中心、亚太航空枢
纽 港的重要组成部分,是上海地区民用航空运输的重要交
通枢纽。机场始建于1921年 ,并于1950年 重建,建筑占地
约
某地铁隧道病害治理施工工艺及环境影响评估(论文).pdf