二 规划设计 The Planning Design
· 规划设计理念
Conception of the planning
· 功能分区
Function zoning
· 交通规划
Traffic planning
· 综合经济指标
Comprehensive economic indexes
三.建筑设计 The Architectural Design
· 建筑构思理念
Conception of architectural design
· 平面功能
Functional plan
· 流线组织
Flow organization
· 无障碍设计
Obstacle?free design
·
车站建筑经济技术指标
Economic indexes of architectures within the Station
四.站房单体技术设计 Techical Design
· 结构设计
Design gist
· 建筑给排水系统
The draining system design
· 建筑电气设计
The electricity design
五.投资估算
The Investment Estimate
· 编制依据
Basis of organization
· 编制范周及单元
Scope and unit of organization
· 各项工程费用编制
Organization of each engineering expenses
C ontents
Estimate in total
Conception Design Schemes of New Changsha Passenger Railway Station
6
Preface
20
2000
2050
1.2
200
In the first two decades of this century, China will further push forward its all-rounded development: tripling the GDP of 2000, remarkably enhancing comprehensive national strengthen and international competitiveness.
In terms of passenger transportation, the country will build fast passenger paths among capital cities and other large and medium cities. A “4 Vertical and 4 Horizontal” fast passenger transportation railway path and three cross-city fast passenger
transportation systems will be planned. By then, a total of more than 12,000 kilometers of passenger transportation railway will have been built with the desired speed of passenger train being over 200 kilometers per hour.
Being an essential part to railway network, trans stations have already established themselves as comprehensive traffic hubs and modern passenger transportation center on urban and regional levels.
Conception Design Schemes of New Changsha Passenger Railway Station
7
City general situation
1) 1) Changsha city is the political, economic, scientific and educational and cultural centre of Hunan Province, the key
city in mid-south China region. The Chang-Zhu-Tan economic integration, taking Changsha as the main part and
Zhuzhou and Xiangtan as two wings, through continuous exchange and mix together, will be the main core area of
economic development of Hunan province. On the ever heating gold travel route of Hengshan, Shaoshan, Changsha.
Zhangjiajie, Changsha is located in its center, which is the most important originating and terminating area and gathering
and dispersing area of transit of passenger flow in the province. Draw on the experience of development of metropolis
and group of big cities in the world, there must be a modernized internationalized infrastructure network and then the
developed railway network of big capacity, with high efficiency and environment protection will be no doubt the
inevitable selection. 2) Changsha Zhuzhou railway hub is connecting four trunk railway lines of Jing~Guang, Zhe~Gan, Xiang~Qian and
Shi~Chang, is one of the main railway hubs in central China, and also the main component part of Changsha City
communications infrastructure. In accordance with the <Plan of Medium and Long Term Railway Network>, by
building Wuhan~Guangzhou Passenger Special Line and Hongzhou~Changsha Passenger Special Line in Changsha,
Zhuzhou hub, the layout of “ross type” passenger special lines will be formed gradually within the hub, the regional
passenger operation center with Changsha Station and the New Changsha Station as the main passenger stations so as to
meet the requireme