42 【摘 要】 四川省是国家水能资源基 地,近十年间先 后有众多大型水电站 修建,不仅 工 程规 模巨大、地 质条 件复杂、设计标准 和 技术难度均超出现行规范和经验,也同时对常规造价模式提出了挑战。笔者结合所参与某水电站项目中所提出的大坝工程合同所 涉及帷幕灌浆工程钻孔量与耗浆量不匹配问题,根据实际施工情况和相关设计和试验资料,开展了专题分析研究,以灌浆单耗量 分段法对单价进行细化测算,并按合同管理费损失平衡法核算,用工程类比分析法修正低单耗计量方式,最终提出合理帷幕灌浆 单价范围和 计量方式,为合同问题 处理提供了理论 依 据 和参考。 【关键词】 水电站 大坝帷幕灌浆 灌浆计价 合同单价调整 【中图分类号】 TU-9 【文献标识码】 A 【文章编号】 1008-2166 (2020 )04-042-06 【DOI】 10.19730/j.cnki.1008-2166.2020-04-042 Analysis and Research on Change in Unit Rate and Measurement Mode of Dam Curtain Grouting Works Wang Yan,Qiao Yue bin,Zhu Mingrun (Chengdu Engineering Corporation Limited,Chengdu 610072,China) 【Abstract】 Sichuan Province is the largest hydropower generation base in China and has developed many great projects for last ten years. with huge scale and complex geological conditions,whose design and construction technology has been beyond the existing codes and experiences. During the construction stage, the curtain grouting works of both the left and right bank dam contracts encountered with the problem that "the total length of drilling holes increases greatly while the total amount of grouting decreases greatly, and the unit grouting rate is far lower than the value assumed in the bidding stage". Accordingly, the contractors submitted the change requirements for the related unit prices and measurement methods. Therefore, based on the actual construction situation of curtain grouting and relevant designs and test data, a special analysis and research was carried out. The original measurement mode in one unit price for grouting was replaced by the mode consisting of new unit prices of seven continuous intervals of grout consumption, and composed of under the sector norms and the market discount factor. The set of unit prices were further back-calculated on the principle of management indirect cost equation of contract and readjusted in reasonable range. Further, the measurement method was slightly changed to be made on the unit of meter for low grout consumption interval by learning similar projects experiences. Finally, a measurement proposal was concluded and recommended for the settlement of contract problem. 【Keyword】 Hydropower project; Dam curtain grouting; Grouting measurement; Change in unit rate 作者简介:王 燕(1969— ),女,江苏常州人,高级工程师, 主要从事水利水电工程造价和咨询、工程计价工作。 乔月宾(1980— ),男,四川成都人,高级工程师,主要从事水利水电工程造价和咨询工作。 收稿日期:2020年3月 水电站大坝帷幕灌浆合同价格调整研究 王 燕 乔月宾 朱明润 (中国电建集团成都勘测设计研究院有限公司,四川成都
水电站大坝帷幕灌浆合同价格调整研究(论文).pdf
微信