· 83·
随着社会经济的快速发展,我国各个地区城镇化趋势越
来越明显,相应的市政工程建设规模、质量都在持续提升。市
政工程作为投资量大、施工环节复杂、质量要求高的工程项目,
市政工程预结算审核要点及对策
方惠娟
(湖北省交通规划设计院股份有限公司厦门分公司,福建厦门 361000)
[摘 要] ??]Q?ndk?`?]Q?
?,???]/仕G圈??]???7? 。"? t}??]Q?
?
/其?G圈??仕妙? ,?堵 t]Q h?? 、]Q??]Q圈??仙???$ 。??六# H ,坤之 t?r??0仕G
圈儿%0健 8
f?,?$T???%妙?,?7??
????堵???G圈????。
[关键词] ??]Q ;]QG圈 ;G圈??
[中图分类号] TU 723.3 ;TU99 b b b b b [文献标志码] A b b b b b [文章编号] 1001–523X(2021)24–0083–02
Key Points of Municipal Engineering Pre -settlement Audit and Solutions
Fang Hui-juan
[Abstract ]Municipal engineering is an engineering project with public service value, and the pre-settlement audit work during
construction is very important. The article expounds the significance of strengthening pre-settlement audits in municipal engineering
projects,and analyzes key points such as bills of quantities, engineering costs,and engineering settlement audits. Combined with
actual cases,it is proposed to build a scientific pre-settlement mechanism, establish a scientific management model,strengthen the
awareness of personnel cost control,pay attention to project design analysis and innovate pre-settlement review methods.
[Keywords ]municipal engineering;project pre-settlement ;pre-settlement audit
其建设过程的造价控制十分重要。预结算审核作为市政工程
项目造价管理中的关键环节,需要引起项目单位及责任部门
的足够重视。新形势下,针对市政工程预结算审核工作问题
和创新思路的探究很有必要。
1 市政工程造价预结算审核的意义
由于市政工程往往需要在复杂的环境下施工,各种自
收稿日期 : 2021–10–13
作者简介 : 方惠娟( 1990—),女,福建漳州人,助理工程师,主要研究
方向为公路 /市政工程造价。
应工序的操作流程和方法。盾构施工前由土木工程师认真分
析设计图纸和地质勘查资料,根据地质条件、现场情况分段
制订详细的掘进指令,指导现场盾构施工。在盾构施工的同时,
安排工程师及技术人员及时对已完工程的掘进、拼装、监测
等各类收集、整理的数据进行研究分析,不断总结施工中的
经验,为下一步施工提供可靠的借鉴依据。
(2)安排专业技术人员根据设计图纸和地质详勘资料,
提前分析拟定刀具的检查位置、方法等措施,加强刀具的管控,
使刀具管理及利用率达到最优状态,为盾构掘进及施工提供
强有力的基础保障。
(3)定期组织盾构施工相关人员进行针对性的技术培训,
使所有盾构施工人员了解盾构施工重、难点,掌握应对措施,
为盾构施工做好技术支持。
(4)成立机械设备管理小组,由机械、电气、液压专业
的技术人员组成,制订盾构机日、周、月检修保养计划,并
及时对盾构机进行维保,确保设备完好。
6.3 b) h????
施工过程中安排专业技术人员对盾构施工进行过程跟踪
控制,落实专业施工人员对管片施工质量进行复检,专职质
检人员进行终检,以确保盾构施工整体施工质量。做好施工
人员安全、质量交接班、岗前等日常教育、培训工作,做到
人人心中有安全、员工处处重质量,
市政工程预结算审核要点及对策(论文).pdf